Safety Testing & Certification for property developers in Bristol
The specification should come from the engineer and follow BS 8500 and BS EN 206, which set out how concrete is specified by strength class, exposure class and other requirements. Exposure class matters for elements in contact with the ground, where sulfates in the soil can attack concrete, so the site investigation findings must reach the concrete specification. Ready-mixed concrete arrives with a delivery ticket recording the mix, batching time and quantity, and those tickets should be checked on arrival and kept. Water should not be added on site to ease placing unless the specification allows it, because it reduces strength.
On-site testing usually includes a consistence test, often a slump test, on delivery, and making test cubes to be cured and crushed at a laboratory, commonly at 7 and 28 days, following the BS EN 12350 and BS EN 12390 series. The sampling frequency is set by the specification. Cubes must be made, stored and transported correctly, because a badly handled cube can fail even when the concrete in the structure is sound. Ask who will make the cubes, where they will be stored and which laboratory will test them.
